Where EarnedCurve fits — and where it doesn’t

Most teams measuring rules-of-credit progress today are doing it in one of three places: a spreadsheet, the percentage field in P6, or a full EVM suite bolted onto the ERP. Each works until it doesn’t, and each fails in a different way. Here is the honest version of all four, including ours.

EarnedCurveSpreadsheet + monthly meetingThe % field in P6Full EVM suite on the ERP
Where the percentage comes fromDerived from weighted steps — never typedWhoever owns the fileTyped by the planner from a verbal updateConfigured measurement methods, if they were set up
Can you trace a number back to evidence?Always — item, step, and source documentOnly if someone kept the workingNoSometimes, through the CA structure
Level 4 detailNative — thousands of items per projectYes, until the file gets too bigNone — L3 is the floorYes, at implementation cost
Bridge to the L3 programmeStep-band map, derived automaticallyManual, monthly, arguableN/A — it is the L3Via integration, if scoped
Is last month immutable?Yes — snapshots; open period writes onlyOnly by disciplineNo — overwritten each updateUsually yes
Scope change separated from performanceComputed on every period reportRarelyNoIf the change control is followed
Automation guardrailsProposes only; regressions never auto-appliedN/AN/AVaries
Where the data sitsYour browser — never uploadedOn someone’s laptop, emailed aroundThe P6 databaseVendor cloud
Time to a first real numberAn afternoon — import, map, claimA week of template buildingMinutes, and worth what it costMonths
What you pay forProject size — free under 2,000 hoursNothing, then everything in a disputeP6 seatsSeats, modules, and implementation
Being straight about it

What EarnedCurve deliberately does not do

A tool that claims to do everything is a tool that has not decided what it is. These are not gaps on a roadmap — they are boundaries, and the product is better for having them.

−
It does not schedule
No CPM engine, no logic editing, no date calculation. P6 owns the programme; EarnedCurve reads it, reconciles to it, and hands corrections back for you to apply. If you want schedule quality and risk analysis, that is a different tool — see below.
−
It does not do cost accounting
Actual costs (ACWP), indirects and overhead recovery belong to your ERP. EarnedCurve imports actuals to compute CV and CPI; it will never be the book of record for what was spent.
−
It does not replace your EDMS
Documents live where they live. EarnedCurve reads an issue-register export to propose claims by document number — it does not want to be your document repository, and it does not store your documents.
−
It does not use AI to judge progress
No part of your project data is sent to, processed by, or used to train a language model. Every figure comes from deterministic code you could re-derive with a calculator, because that is the only kind of figure worth defending.
The rest of the toolkit

Three sister products, one discipline

EarnedCurve is one of four Vantis Project Intelligence tools. They share a philosophy — browser-based, no install, transparent maths, your data stays yours — and each does one job properly rather than four badly.

Schedule assurance

ScheduleInsight

Score any Primavera P6 or Microsoft Project schedule against the DCMA 14-point assessment plus four more, drill into the activities failing each check, compare revisions forensically, and produce a client-ready report. Where EarnedCurve asks “is this progress real?”, ScheduleInsight asks “is this programme sound?”

scheduleinsight.com →
Quantitative risk

RunMonteCarlo

Probabilistic schedule and cost risk analysis in the browser — thousands of simulated runs, confidence-banded completion dates, and the activities actually driving the spread. The natural next question once your baseline and your progress are both defensible.

runmontecarlo.com →
Planning

Sketchdule

Build and communicate a programme without a full P6 licence — fast schedule sketching, XER import and export, and presentation-grade output for the times a bid or a board pack needs a schedule before the planner does.

sketchdule.com →

Pick the fight you’re actually having.
Ours is the percentage.

Create a workspace and see what a traceable progress figure looks like end to end.